Loading...
Loading...
acd-receives-order-from-tge-marine-gas-engineering-for-lng-fuel-gas-pumps
acd-receives-order-from-tge-marine-gas-engineering-for-lng-fuel-gas-pumps

ACD receives order from TGE Marine Gas Engineering for LNG fuel gas pumps

ACD has received an order from TGE Marine Gas Engineering to supply LNG fuel gas supply pumps for a new LNG carrier from MEYER WERFT GmbH.

The new tanker will transport LNG with a cargo capacity of 15,600 cbm. The vessel will be Bureau Veritas (BV) classified and meet the highest environmental standards.

Delivery of the LNG fuel gas supply pumps is slated for May 2012, with the new vessel delivery scheduled for the end of 2012, gasworld understands.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->