Loading...
Loading...
air-liquide-doubles-its-biomethane-production-capacity
air-liquide-doubles-its-biomethane-production-capacity

Air Liquide doubles its biomethane production capacity

0

Air Liquide has commissioned three new biomethane production units since the beginning of 2018, doubling its biomethane production capacity.

The three new biomethane production units commissioned by the Tier One player are located in the United States (Walnut, Mississippi), France (Cestas, near Bordeaux), and the United Kingdom (Northwick, near Birmingham).

With these units, Air Liquide has doubled its biomethane production capacity, which now stands at 60 MW, the equivalent of 500 GWh for a full year of production.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->