Loading...
Loading...
air-products-wins-nitrogen-contract-for-flng-project
air-products-wins-nitrogen-contract-for-flng-project

Air Products wins nitrogen contract for FLNG project

Air Products has confirmed a supply agreement with TP JGC Coral France for the supply of its medium and high purity nitrogen (N2) package for a floating liquefied natural gas (FNLG) facility to be located in the Indian Ocean, offshore Mozambique, Africa.

This represents the company’s second supply contract with TP JGC Coral France for this project. Earlier this year, Air Products announced an agreement to supply its proprietary cryogenic coil wound heat exchanger technology and liquefaction process license for the facility.

The FLNG facility being built by TP JGC Coral France, an incorporated joint venture formed by TechnipFMC and JGC Corporation, along with Samsung Heavy Industries, will utilise Air Products’ advanced PRISM® membrane separators to produce both medium and high-purity N2. The combined N2 production will exceed 100,000 Nm3/day. The FLNG plant will be moored and operate on the surface above 6,500 feet of water in the Indian Ocean, in a natural gas field known as Area 4 of the Coral Field.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->