Loading...
Loading...
caloric-wins-first-uk-project
caloric-wins-first-uk-project

Caloric wins first UK project

CALORIC has secured its first contract in the UK, for a small industrial carbon monoxide (CO) onsite generation plant of 40 Nm/h.

The plant will be delivered to a chemical company in the UK and will be realised as a turnkey project within a 15-month schedule.

With the CALORIC CALCOR® process, carbon monoxide is produced by reforming of a hydrocarbon (natural gas or LPG) with carbon dioxide at high temperatures and low pressures, in the presence of catalysts. A final membrane unit purifies the synthesis gas to the required quality.

The Caloric CALCOR® technology for CO generation is effective as a low methane content, just within ppm range in the raw gas, and allows for a membrane purification unit instead of the more widely used cold box purification. The membrane achieves the same recovery and similar product purity as the cold box, but at much more favourable capital and operation cost.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->