Loading...
Loading...

Foundations underway at Siegen site

Industrial gas specialist the Messer Group has declared construction is underway for its new production facility for air gases, at the site of Deutsche Edelstahlwerke in Siegen-Geisweid.

Ongoing foundation work is taking place and between the end of June and the end of August, almost 200 steel pipes, each 50cm in diameter, are being driven 10m into the ground at the building site.

These form part of the foundations that will support the 60m-high cold box of the production unit for oxygen, nitrogen and argon, with work being carried out jointly by local building contractors Quast and Hundhausen.

Messer is investing around €35m in the construction of the new air separation plant on the site of Deutsche Edelstahlwerke, and Project Manager Dirk Giesecke from Messer Group GmbH in Krefeld commented, “We deeply regret that high levels of noise are currently being generated on our construction site. However, the ground conditions make pile foundations necessary in order to ensure the stability of the structures.”

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->