Loading...
Loading...
ge-and-sargas-announce-gas-turbine-agreement
ge-and-sargas-announce-gas-turbine-agreement

GE and Sargas announce gas turbine agreement

0

GE has announced it has concluded a commercial alliance agreement with Norway-based Sargas to provide a gas turbine for one of the world’s first gas-fired plants with integrated carbon capture for enhanced oil recovery (EOR).

The Sargas plant will combine a configuration of the existing LMS100 aeroderivative gas turbine package from GE with Sargas’ patented combustion and carbon-capture technology enabling low emissions power generation.

The technology provided by Sargas captures carbon dioxide (CO2) at pressure, which requires lower capital investment costs and can be built quickly with existing or slightly modified subsystems and equipment. The Sargas power plant delivers significantly lower costs of electricity and captured CO2 per ton and therefore enables the Sargas-led engineering, procurement and construction (EPC) consortium to offer industrial-scale volumes of economically competitive CO2 for EOR applications worldwide.

GE’s LMS100 turbine is a combination of proven frame and aeroderivative gas turbine technology and represents one of the most extensive collaborations of design and manufacturing expertise in the history of GE, delivering unparalleled efficiency.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->