Loading...
Loading...
germanys-first-co2-separation-plant-for-cement-production
germanys-first-co2-separation-plant-for-cement-production

Germany’s first CO2 separation plant for cement production

Cement plant operator Rohrdorfer is set to reduce the carbon footprint of its day-to-day operations following announcement of carbon dioxide (CO2) separation plant being built on-site.

Scheduled to go into operation by the end of June 2022, the plant will capture two tonnes of CO2 per day before being utilised in the regional chemical industry. 

The foundations for the plant – which is being built in cooperation with the Andritz Group – are already in place on the southern side of the Rohrdorfer cement works. 

The company plans for a 25m high pilot plant for CO2 separation to be built within an area of around 30m2

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->