Loading...
Loading...
linde-develops-fully-customised-large-scale-integrated-gas-production-system-in-kazakhstan
linde-develops-fully-customised-large-scale-integrated-gas-production-system-in-kazakhstan

Linde develops fully customised, large-scale integrated gas production system in Kazakhstan

0

Linde AG will develop a fully customised, large-scale integrated gas production system at the world’s largest steel corporation in Kazakhstan as part of a €70m ($83m) investment.

The Tier One company already operates an air separation unit (ASU) at ArcelorMittal’s steelworks Temirtau site in Kazakhstan. ArcelorMittal Temirtau plans to increase its production of hot metal in the coming years which will lead to a significant growth in the demand for industrial gases.

The new ASU, once in operation, will be connected to the first one, together forming an intelligent supply system for ArcelorMittal’s production. The new plant will not only meet increasing gas needs of the steel mill but also have the capacity to act as a backup, ensuring highest product availability at all times. It is set to go on stream in November 2019.

Bernd Eulitz, Member of the Executive Board of Linde AG, said, “We are very pleased to extend the partnership with our long-standing and well-established customer ArcelorMittal by building another ASU in Temirtau. The new unit will form, together with the first one, a reliable integrated gas production system that will accommodate the increasing industrial gas needs of the steelworks.”

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->