KBR has announced it has been selected as Höegh’s preferred engineer to execute pre-FEED studies for two of its projects off the coast of Israel and offshore Australia.
KBR will provide the pre-FEED study for the King liquefied natural gas-floating production storage and offloading (LNG-FPSO) facility currently being evaluated for Noble Energy’s giant Tamar gas field off the coast of Israel.
KBR has developed FPSOs that are in use worldwide and is recognised as one of the world’s leading providers of onshore LNG plants and FPSOs.
Höegh LNG awarded KBR a second FLNG pre-FEED study for an unnamed project offshore Australia. The four-month pre-FEED is intended to provide a Total Installed Cost (TIC) estimate for a two mtpa FLNG facility to enable further evaluation of the project.
... to continue reading you must be subscribed