Loading...
Loading...
ssi-redcar-steel-plant-mothballed-just-under-three-months-after-boc-supply-deal-signed
ssi-redcar-steel-plant-mothballed-just-under-three-months-after-boc-supply-deal-signed

SSI Redcar steel plant mothballed just under three months after BOC supply deal signed

SSI Redcar, the steel plant in Teeside, has been mothballed – spelling the loss of 1,700 jobs.

The news is significant to the industrial gases sector as just under three months ago, SSI signed a 15-year supply agreement with BOC – heralded as the UK’s largest ever deal.

To support the contract, BOC invested £25m in its Teesside site.

The two-year investment programme is now complete and includes an upgrade and expansion of the three existing Air Separation Units (ASUs) which supply oxygen, nitrogen and argon, and re-engineering the existing pipeline systems to SSI UK’s site. Specialist control equipment has also been designed and built for SSI UK’s blast furnace.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To access hundreds of features, subscribe today! At a time when the world is forced to go digital more than ever before just to stay connected, discover the in-depth content our subscribers receive every month by subscribing to gasworld.

Please wait...
-->